automatic labeling machine for plastic bottles/bottle opp labeling equipment/scorching melt labeling machine for can
Machine Feature:
The bottles are picked up by the infeed starwheel and transferred to the bottle table. The bottle rotation commences when they are positioned among bottle plates and centering bells.
The speed of the feed roller is altered to the required label length for constant world wide web rigidity. A common threading unit makes certain best film feed. In the chopping device, the labels are specifically reduce while a PLC command and servo-motor offer an exact lower-off position.
Two slender strips of very hot soften glue the labels collectively, which are applied by a heated glue roller to the major and trailing label edges. The label with the glue strip on its foremost edge is transferred to the container. This glue strip makes certain an exact label positioning and a constructive bond. As the container is rotated throughout label transfer, labels are utilized tightly. Gluing of the trailing edge assures appropriate bonding.
CZPT Parameters :
Name |
OPP Hot Melt Labeling Device |
Power supply |
3-phase 380V sixty Hz 5000W |
Machine dimensions: |
3650mm×1700mmX 2571mm(can be altered by client requirements) |
Method of velocity adjustment: |
uninterrupted – modify price |
Labeling precision: |
±1mm |
Labeling pace |
4000-15000bph |
Maximum label width: |
200mm(common width, can be modified ) |
The optimum outer diameter of label |
600mm |
Paper core Scorching soften |
152 mm |
Labeling glue: |
glue at each ends of every single label with hot melt |
Gluing temperature: |
120~160ºC |
Labeling kind for items: |
ideal for round or sq. containers made of plastic, metal, glass |
Type of label: |
opp, bopp ,paper-plastic composite film ,paper label |
Labeling stations: |
12per cycle |
Machine fat: |
about 3000 kg |
Mechanical Parts:
Transportation establishment | TRANSTECNO motor 750W(with deceleration by TRANSTECNO ), inverter speed manage |
CZPT | Italy FLEXON LF820-K325 industrial nylon chain plate conveyor |
Mainframe transportation institution | TRANSTECNO motor 2.2Kw (with deceleration by TRANSTECNO) |
Sub bottle institution | industrial worm sub bottle institution |
Into bottle establishment | with worm sub bottle institution and starwheel placement feeding establishment to make certain the accuracy and security of loading |
Situation establishment | Mechanical pre-spot , employing the camwheel establishment to planish the bottle for label positioning |
Labeling institution | Containers are decide up by rotary wheel ,labeling throughout the rotation. |
Offer label institution | high pace servo opp label source system (drive by servo-motor) |
Pressing label establishment | Arc brush unit |
Xihu (West Lake) Dis.d bottle establishment | change by double coordinate area manual rail |
Glue source method | hot soften glue supply system(German SEIMEC manage technique) assures the precision and uniformity of gluing |
Safety part:
Protection security | In purchase to preserve the operator basic safety ,when the device is managing make sure you near the protective doors |
Absence of label alarm | Set an alarm to remind the operator to change the label when the label will be use out |
Lack of bottle alarm | When lack of the bottle the device will stop and make an alarm .The device will restart routinely as quickly as the bottles have been put that will aid on-line creation |
Leak of labeling alarm | To control the top quality of labeling |
Stress tests | When the pressure can not meet the equipment requirement ,the machine will end to in opposition to poor goods make |
Vacuum screening | When the vacuum can not meet the products prerequisite ,the device will stop to against poor goods generate |
Temperature tests | When the temperature can not fulfill the gear necessity , the equipment will end to against negative merchandise generate |
Packing and Shipping and delivery:
Manufacturing unit:
Our servies:
Just before the purchase:
We will make comprehensive remedy for you based mostly on your requirments.
We will deliver you videos of our items to know much more about our machines.
If you are inclined to pay a visit to our factory,we will select you up at a close by airport/station.
Right after the get:
We will start to generate machines and update the progress.
Our engineer will attract the format for you.
Soon after-product sales support:
Prepare our engineer to your manufacturing unit to install machines if you need,prepare your employee till they can operate devices properly.
Provide you 2 years guarantee with spare components 2 year cost-free.
24 hours for engineer reaction (all companies part 5days in buyer hand by Intl’ courier)